Installed footage

330 LF

Installed footage across the project production history loaded so far.

Average pace

34.74 ft/hr

Blended production rate for this job.

Documents / forms

1 / 1

Project-linked document records and saved form submissions.

Production entries

1

Saved field logs tied to this job record.

Core job context

active
Project type

Utility work

Work types

Sanitary sewer, Laterals

Assumed bedding

6"

Backfill factor

0.9

Hosted preview is using read-only demo data until the production database lane is wired.

Output by work type

1 types

Sanitary sewer

1 entries

330 LF

34.74 ft/hr

Latest field entries

1 loaded

Sanitary sewer

10+50 to 13+80

330 LF
Date

5/16/2026

Crew / hours

5 people · 9.5 hrs

Feet / hour

34.74

Conditions

Mixed clay / fill

47F, wet surface, light wind

Documents and forms

2 loaded

Issued For Construction Plan Set Rev 3

42 sheets, indexed by discipline

plans

5/16/2026

Daily inspection report

Open workflow

Needs signoff

5/16/2026