Addendum
read before you priceAddendum No. 1
Issued Nov 20, 2026Hydrants: the Village's standard is now a 5-1/4 inch main valve with a Storz pumper nozzle (Section 33 11 00, 2.4). Questions are due by November 30. The bid opening stays Thursday, December 10 at 2:00 PM.
In this package: Pipe, valves & hydrants (materials)
From Northline Civil Contractors
A sample bid on a fictional job, so you can see a plan room the way a sub does. Open your trade's package: the scope sheet says what to price, then its spec sections and sheets. Leave your name to see how the contractor's side works.
Bidding this job? Let Northline Civil Contractors know
Your trade
tap to openPipe, valves & hydrants (materials)
Bid items 2, 3, 4, 5: 8-inch PVC C900 Water Main, 8-inch Gate Valve and Box, Fire Hydrant Assembly…
- ScopeScope sheet — Pipe, valves & hydrants (materials)
- Spec 33 11 00 — Water Distribution Piping · book pp. 10–12
- Drawings C-101–C-501 — Water Main Plan and Profile; Water Main, Trench and Hydrant Details · 3 sheets
Paving & restoration
Erosion control & landscaping
Aggregates & select fill
Bid set (all trades)
read firstThe owner's published bid documents. Read first.
- Advertisement for Bids
- Bid Form
- Specifications (project manual)